Sunday, January 4, 2015

ROAD DIET PRIMER, RT 302 Barre-Montpelier Rd

This 3 minute VIDEO is a primer on ROAD DIET - reconfiguring existing lanes to make MORE EFFICIENT USE OF ROAD SPACE THAT WE HAVE and to make the road SAFER FOR ALL USERS.

Published on Dec 23, 2014
VTrans will be reconfiguring lanes on Barre-Montpelier Rd (Rt. 302) as part of a paving project in Spring 2015. The new lane configuration will be in place for a 60-day trial period, and will feature a reduction in vehicle traffic lanes. The new configuration is projected to reduce vehicle collisions along Barre-Monpelier Rd, while continuing to sufficiently handle the traffic volume. The extra space along the roadway will be used to implement a buffered bike lane that creates a safe and comfortable environment for bicycle traffic.



Saturday, December 27, 2014

JOIN ADVOCACY GROUPS, EDUCATE THE PUBLIC.

The NORTH AVENUE CORRIDOR STUDY Advisory Committee delivered a best-practices set of recommendations to City Council in 2014. Attempts to sabotage the plan were resisted by Council, with the exception of an amendment by Kurt Wright (R Ward 4) that limits the duration of a pilot project demonstrating road diet. A demonstration needs to be of sufficient duration to correct for learning curve and knee-jerk resistance to change. Another amendment proposed by Wright and Councilor Tom Ayres would restore parking on the avenue. Details HERE.

A deceptively worded petition was circulated among residents who had not participated in or followed the planning process. Subsequently, a candidate for City Council has built opposition to the corridor plan into his campaign platform. (WARNING: Don't sign deceptive petitions, and don't vote for Michael Ly.)

Meanwhile, the BikeQ of the City increases steadily and the changing demographic of the North End is bringing savvy seniors, Gen Y, and young families together in common cause for safety of all users of The Avenue.

click to enlargeFILE: MATTHEW THORSEN
    "Losch referred to the robust citizen participation in the corridor study, and also to an overall sense that the city's "bicycle moment" may have arrived. "It seemed that every meeting had more and more people," she added. The project "just kind of snowballed.""

    A lot of excellent details here: THE BURLINGTON WALK/BIKE COUNCIL   


    Research and factual responses to misinformation on FPF -- BIKEABLE BURLINGTON NOW

    We've been discussing these issues since 1994, but Burlington is still using transportation funds for Southern Connector (aka Champlain parkway -- park way, LOL)  instead of investing in transportation systems.  Keep the vision. https://www.cctv.org/watch-tv/programs/vt-grassroutes-transportation-potluck 

    Thursday, October 16, 2014

    Don't whine and cluck, ORGANIZE! Run for City Council.

    Bring biking councilors to City Hall, send message that we will bring bike culture to city streets and out The Avenue!

    http://nextcity.org/daily/entry/streetspac-endorse-new-york-council-vote-bike-lanes-transit


    (AP Photo/Kathy Willens)
    Putting in bike lanes or reducing parking can be a politically dangerousmove, especially in New York. But for the past year and a half, political action committee StreetsPAC has been fighting for pro-pedestrian, pro-biking and pro-transit candidates in NYC and Albany — and gaining ground.
    In the 2013 city elections, 13 of StreetsPAC’s 18 endorsed candidates won in competitive primary elections (including Mayor Bill de Blasio). In state primaries last month, three out of five StreetsPAC-backed candidates won.

    Friday, October 10, 2014

    North Ave Safe Bike Lanes and Crossings

    LEA TERHUNE, WARD 4, BURLINGTON
    To get involved in ongoing effort to create safe multi-modal options on North Avenue, please join Bikable Burlington now. https://www.facebook.com/groups/519506491526901

    Thursday, October 9, 2014

    90 minutes testimony from residents, 90% opposed to amendments

    Attend party caucuses. 
    Run for office. 
    Challenge councilors who don't represent you.  


    COUNCILORS FROM NORTH END WHO THE AMENDMENTS TO UNDERMINE COMPEKLTE STREETS RECOMMENDATIONS? 
       Kurt Wright (Ward 4)
       Dave Hartnett (Ward 4)
       Tom Ayres (Ward 7)

    Members of Corridor Advisory Committee who presented a complete streets set of recommendations to City Council are Jason L'Ecuyer (Ward 7), Barry Trutor (Ward 7), RJ LaLumiere (Ward 4), Jim Holway (Ward 4). Jason is vying for Dem nomination at Dem Caucus Jan 11, challenging Tom Ayres. 

    Join: facebook.com/groups/5195064…

    #btvcc Resolution on North Ave passes with 4 amendments, 14/0. Progress made, with some minor setbacks.


    #BTVCC Tonight's vote on North Ave summed up pretty well by @bfp_news burlingtonfreepress.com/story/news/loc…


    #btvcc meeting & North Ave proposed changes who wants to get more involved, please join facebook.com/groups/5195064…


    #BTVCC sets precedent: #BTV voters will be allowed to veto city projects after 6 months, see South End Connector, Moran.

    #BTV City Council. On the agenda: North Avenue bike lanes. #btvcc #vt pic.twitter.com/wJlqhFnjWt

    Monday, October 6, 2014

    The FACTS about sabotage of Advisory Committee's Complete Street recommendations

    TomorrowTo (Monday, Oct. 6) the City Council will be voting on the resolution to adopt the North Ave. recommendations, as described below.  The actual resolution is linked here:


    http://www.boarddocs.com/vt/burlingtonvt/Board.nsf/files/9PHNDH5F3CA5/$file/DPW%20-%20North%20Avenue%20Corridor%20Plan%3B%20Create%20North%20Avenue%20Task%20Force.docx

    There have been two amendments proposed by Councilors Kurt Wright and Tom Ayres that should be specifically addressed in public comments [and voted down]. 

    The amendment proposed by Councilor Ayres, linked here:
    http://www.boarddocs.com/vt/burlingtonvt/Board.nsf/files/9PJRQ46E9DFB/$file/Amendment%20per%20Councilor%20Ayres%20North%20Avenue%20Corridor.docx

    It basically switches the language from removing all parking to "no parking at least on one side of North Avenue", removes the protected bike lane pilot with flex posts between Institute Road and VT 127, and removes the buffered bike lane between Shore Road and Plattsburg Avenue.  So we would still have parking on one side of the road, and the bike lanes in these two sections would be unprotected/unbuffered on both sides and in the door zone on one side.  This seriously weakens the short-term benefits of the project.  We especially want to preserve the pilot of the protected bike lane between Institute Road and VT 127 (although honestly I think it makes more sense between Washington St. and Institute Rd.).  This proposed amendment should be rejected entirely by the City Council.

    Tuesday, September 30, 2014

    I am emailing you as a Burlington supporter of Local Motion who wants to see our city become a truly great place for people-powered transportation.  Next week -- on Monday, October 6 -- we have the opportunity to take a huge step forward for walking and biking in Burlington, and we need your help.  

    Over the last year or so, Local Motion has been intensively involved in a project to chart a new future for North Avenue, Burlington's longest street and the backbone of the New North End.  With strong leadership from New North End residents, a consensus has emerged around a series of commonsense changes that will make North Avenue safe and accessible for everyone, whether you are walking, biking, taking the bus, or driving.

    Friday, September 19, 2014

    New Date for City Council Hearing/Action on North Avenue Corridor Plan: Monday, October 6

    Members of the North Avenue Corridor Study Advisory Committee and public meeting attendees were notified on Sept. 18 that the City Council Hearing and Action on the draft corridor plan (scheduled for Sept 22) was RESCHEDULED for  Monday, October 6. Contois Auditorium. Public Forum, 7pm.

    At the council transportation committee (TEUC), 19 people advocated for the plan. One person spoke against it, and asked for a delay. We're told the delay was because the Mayor, TEUC, and the City Attorney could not get a resolution written in time for the Sept 22 meeting.

     


    Saturday, September 13, 2014

    Full City Council Considers Approving North Avenue Corridor Plan Sept. 22 after Council Committee Approval Sept 10

    The North Avenue Corridor Plan draft approved by the study Advisory Committee advanced with one minor change to the City Council following a unanimous vote by the Council’s Transportation, Energy and Utilities Committee (TEUC) September 10.

    The Burlington City Council will consider adoption of the plan at their Monday, September 22nd meeting.

    The TEUC, chaired by Max Tracy, Ward 2, vote took place after 19 residents spoke in favor of the Advisory Plan and one resident questioned the need to move the plan which took 15 months to prepare so quickly to adoption.  About 40 residents attended the meeting.  The hearing and vote was held at the Police Department meeting room and is available on CCTV.


    Some amendments were considered by the Committee but eventually withdrawn.  The two-and-a-half hour generally quiet meeting and thoughtfully presented comments limited to two minutes each was broken following the Council approval vote by a burst of applause.  The one change to the draft plan was to retain a 30 mph speed limit between VT 127 and the Shore Rd./Heineberg Rd. intersection.

    Friday, September 5, 2014

    Join Bike Train 2--7:45 a.m. TEUC Day (Wed Sept 10) starting at Merola's (Plattsburgh Ave/North Ave)

    Posted on FPF Sept 3:  FYI


    Ride to Support Bike Infrastructure Sept. 10

    CHRISTINE HILL, CHRISTINE.TYLER@GMAIL.COM, RIVERSIDE AVE.
    Event: Sep 10, 2014
    Burlington Bike Train
    There has been a lot of recent talk of change in the New North End of Burlington, primarily via the recently completed North Ave Corridor Study. The recommended changes will be presented to the TUEC Committee on the evening of this ride. We're riding to show support for real change to the corridor, which is currently very bike unfriendly for most of its length.
    What is a Bike Train? A Bike Train is a group ride that obeys traffic laws and practices courtesy by placing space between riders (as opposed to riding en masse) such that other road users may operate around bicyclists as they would normally. The long line of bicyclists shows that BIKES RIDE HERE and that better infrastructure is needed for all road users to operate safely and efficiently.
    We'll ride from Merola's at the intersection of Plattsburg and North Ave. all the way down to North St. where the current study ends. The ride will double back along Lakeview to end up at Scout & Company.
    Usually, the Mayor is at The Bagel on North Ave on Wednesday mornings, so we might do a quick stop there as well.
    Please spread the word, invite your friends to the ride (and to join the group). We're really hoping for a great turnout for this ride, since a strong show of support for much needed bike infrastructure on North Ave will help push City Council to support the changes we all want!