BURLINGTON VOTED NO. The majority of residents want to try the pilot, and we want bike lanes everywhere in the City. Read all about it: http://www.burlingtonfreepress.com/story/news/local/2016/03/01/btv-residents-split-north-ave-pilot/81153894/
VISION: The newly designed North Avenue is an “all modes” transportation corridor that runs the entire length of Burlington's North End. As the North End’s “main street,” North Avenue meets the transportation needs for all within and outside the neighborhood through the freedom of choice to move through and within the corridor safely by foot, bicycle, public transit or private vehicle, thereby providing multi-modal access to homes, businesses, schools and other destinations.
Monday, March 7, 2016
Tuesday, February 16, 2016
VOTE NO on #2
VOTE NO TO EXPERIENCE THE PILOT, WITH TWO THROUGH LANES FOR CARS, A CENTER TURNING LANE, AND TWO BIKE LANES.
Wednesday, February 10, 2016
Friday, February 5, 2016
North Avenue Task Force Meeting #11
.
February 9, 2016 6pm – 8 pm @ Miller Center
![]() |
| Planning North Avenue for the Future |
1. Review statement from the City about the North Avenue ballot item
2. Review the Task Force talking points
3. Review the DPW Memo on preliminary survey questions and bring suggested changes
2. Review the Task Force talking points
3. Review the DPW Memo on preliminary survey questions and bring suggested changes
Meeting Goals:
1. Discuss City Council decision re: ballot
2. Determine how/if the Task Force can inform neighbors about the ballot; and,
3. Agree on activities (if any) between now and March meeting.
1. Discuss City Council decision re: ballot
2. Determine how/if the Task Force can inform neighbors about the ballot; and,
3. Agree on activities (if any) between now and March meeting.
Housekeeping Items (5 minutes):
· NATF Member and public introductions;
· Review and approve tonight’s agenda;
· Review and approve notes from January 12 meeting;
· NATF Member and public introductions;
· Review and approve tonight’s agenda;
· Review and approve notes from January 12 meeting;
Public Comment Period (10 minutes)
Councilor Comments (as needed)
Discussion about the revised ballot language and the Task Force’s role (30 minutes)
-Packet: Guidance for the Task Force from the City Attorney’s Office
Update and Discussion of DPW Implementation Plans (15 minutes)
• Schedule for design and selection of contractors
• Public outreach plans
• Measuring public input
• Schedule for design and selection of contractors
• Public outreach plans
• Measuring public input
Discussion about Public Input (30 minutes)
• Update on Measuring Public Input
• Packet: DPW memo on Before/After survey questions o Include separate questions about different pieces of the project?
• Update on Measuring Public Input
• Packet: DPW memo on Before/After survey questions o Include separate questions about different pieces of the project?
CCRPC Technical Updates (15 minutes)
-Corrections to Local Motion’s crash data
-Corrections to Local Motion’s crash data
Discuss Task Force talking points for community meetings about the pilot (10 min)
-Packet: draft presentation and talking points for Task Force members
-Packet: draft presentation and talking points for Task Force members
Update “To-Do” List (5 minutes)
Monday, December 28, 2015
AVENUE FOR EVERYONE!
Information HERE! http://www.avenueforeveryone.com/
Here are some of the myths that have been circulated to persuade residents to sign a petition calling for four vehicular lanes on North Avenue. Some claims are obviously false or silly, but others could be substituted for reliable information. Get the facts.
FALSE
Here are some of the myths that have been circulated to persuade residents to sign a petition calling for four vehicular lanes on North Avenue. Some claims are obviously false or silly, but others could be substituted for reliable information. Get the facts.
FALSE
- EPA bike lanes -- Claiming that bike lanes are a conspiracy between the Environmental Protection Agency and Burlington is silly, but it's really code for liberal ideas, claiming that people who ride bikes are liberals, and they most likely support environmental protection. .
- They are trying to take away our cars -- b/w 4 Lane signs are recycled Gun Rights signs, and this claim connects guns with cars, code for the idea that people who want to take away your guns (gun control) also want to take away your cars.
- It will cause congestion and delays when people are trying to get to work. Congestion is present now, and two through lanes, with a middle turning lane and separate bike lanes, will bring consistency and smooth flow to the Avenue. And, it will be much safer, for everyone.
- Even if you support a road diet, you should sign the petition to prevent the pilot project. Say what?
- LEARN MORE: http://www.avenueforeveryone.com/
Friday, December 11, 2015
CAGARY CYCLE TRACK PROGRAM - 95% increase in riders!
The Calgary experience:
"They noted an increase in bike traffic on roads shared with cars, up to an average of 7.6%. However, on certain routes such as 8th Avenue, west of 3rd Street, during the peak hour the percentage of bikes on the road is as high as 46%.
“People[…] are giving it a try over the course of the pilot,” says Glowacz. “[They’re] seeing if they can bike to different destination in downtown, or bike the their workplaces.”
To learn more about the cycle track pilot program, visit the City of Calgary website.
http://calgarybuzz.com/2015/12/calgary-cycle-track-see-increase-in-riders/.
Friday, December 4, 2015
BURLINGTON BETTER BY BIKE!
BE PART OF THE FIRST THOUSAND! SIGN THE PETITION TODAY!
Burlingtonians of all ages want our city to be “Better by Bike.” We want riding on our city's streets to be just as safe as riding on our beautiful lakeshore bike path. We want to be able to send our kids off on their bikes without worry. More broadly, we want a city with a 21st century approach to mobility that puts safety and choice first.
A 2015 survey conducted by AARP Vermont showed that a majority of Burlingtonians 45 years and older would be extremely to very likely to walk or ride a bike more if there were better crosswalks and separate bike lanes. And only 29% feel that there are currently enough bike lanes for safe biking. Burlington clearly needs better streets for biking and safer crossings for walking!
Even with broad support, change never comes easy. There will be pushback from people who think that our streets are only for cars. Too often, people underestimate the positive impact that investments in walking and biking have on the local economy and community.
Will you speak up for change? Will you speak up for vibrant streets that are safe and welcoming for everyone?
Tuesday, November 24, 2015
North Ave Corridor Design is a Model for the City.
North Avenue will be re-engineered to prioritize safety of all modes -- cars, trucks, buses, bikes, and pedestrians. There will be safer ped crossings, protected bike lanes, and through lanes for motorized traffic with a center turning lane. Eventually roundabouts will replace four signalized intersections. As residents learn the value of safe streets design, they are taking a fresh look at old projects like the Southern Connector aka Champlain Parkway.
Wednesday, November 18, 2015
Don't waste time and transportation funding on old projects, old designs.
Nov. 5, the U.S. House of Representatives passed a long-term surface transportation bill that prioritizes funding for multi-modal projects.

The time for Burlington to expand active bike transportation options is now. Highway building is passe, road diet and safe protected bike lanes are the future. We mustn't waste money on old project designs that are stuck in the funding pipeline, We need to move on -- put old car-centric thinking away, and make roads that safer for everyone.

The time for Burlington to expand active bike transportation options is now. Highway building is passe, road diet and safe protected bike lanes are the future. We mustn't waste money on old project designs that are stuck in the funding pipeline, We need to move on -- put old car-centric thinking away, and make roads that safer for everyone.
Friday, November 13, 2015
TAPE OF NORTH AVE CORRIDOR TASK FORCE MEETING and CH17 LIVE SHOW
TASK FORCE MEETING, Nov 10, Miller Center -- https://www.cctv.org/watch-tv/ programs/north-avenue-task- force-meeting-8
LIVE SHOW, Ch17 - https://www.cctv.org/watch-tv/programs/north-avenue-corridor
LIVE SHOW, Ch17 - https://www.cctv.org/watch-tv/programs/north-avenue-corridor
Wednesday, November 11, 2015
SAFE ROADS FOR A SAFER FUTURE
Federal Highway Administration explains "road diet" and why it is recommended today.
Four-lane undivided highways have a history of increased crashes as traffic volumes rise, due to motorists sharing the inside lane for higher speed through movements and left turns. Additionally, as active transportation increases, communities desire more livable spaces, pedestrian and bicycle facilities, and transit options, which are not easily accommodated by a 4-lane undivided roadway. One solution that benefits all modes is a Road Diet (Roadway Reconfiguration).
A Road Diet is generally described as removing vehicle lanes from a roadway and reallocating the extra space for other uses or travelling modes, such as parking, sidewalks, bicycle lanes, transit use, turn lanes, medians or pedestrian refuge islands. Road Diets have the potential to improve safety, provide operational benefits, and increase the quality of life for all road users. Road Diets can be relatively low cost if planned in conjunction with reconstruction or resurfacing projects since applying Road Diets consists primarily of restriping.
For additional information about Road Diets, visit the FHWA Office of Safety Road Diets website at http://safety.fhwa.dot.gov/road_diets.
Four-lane undivided highways have a history of increased crashes as traffic volumes rise, due to motorists sharing the inside lane for higher speed through movements and left turns. Additionally, as active transportation increases, communities desire more livable spaces, pedestrian and bicycle facilities, and transit options, which are not easily accommodated by a 4-lane undivided roadway. One solution that benefits all modes is a Road Diet (Roadway Reconfiguration).
A Road Diet is generally described as removing vehicle lanes from a roadway and reallocating the extra space for other uses or travelling modes, such as parking, sidewalks, bicycle lanes, transit use, turn lanes, medians or pedestrian refuge islands. Road Diets have the potential to improve safety, provide operational benefits, and increase the quality of life for all road users. Road Diets can be relatively low cost if planned in conjunction with reconstruction or resurfacing projects since applying Road Diets consists primarily of restriping.
For additional information about Road Diets, visit the FHWA Office of Safety Road Diets website at http://safety.fhwa.dot.gov/road_diets.
Monday, November 9, 2015
RESIDENTS MONITOR SPEED ON NORTH AVENUE
North Avenue speed monitoring. Residents proactivity on safety.
Hope you can see this video!
Friday, November 6, 2015
North Avenue Task Force Meeting Nov 10
The North Avenue Corridor Task Force welcomes everyone who is interested in the North Avenue Pilot to participate in the next North Avenue Task Force meeting on Tuesday, November 10, 2015 from 6 PM – 8 PM at the Miller Center.
The city council created the task force to "foster a collaborative process of implementation" in the North Avenue Corridor Pilot Project. Please join us to add your voice to the discussion and help us on the path to creating an Avenue for Everyone.
Tuesday’s agenda includes:
• Public Input
• Decision on phasing the pilot in stages, north to south
• Decision on parking/bike lane configuration
• Review public outreach material and activities
• Discussion on measuring public input
• Decision on phasing the pilot in stages, north to south
• Decision on parking/bike lane configuration
• Review public outreach material and activities
• Discussion on measuring public input
Thanks to all of the engaged people who showed up to the last meeting. Your input helps us to make the work better.
Monday, October 12, 2015
"Right now it's more of a suburban road, and with the reconfiguration we'll be providing more pedestrian access, bike access and also providing a lot of aesthetic appeal to the road..." SOUND FAMILIAR?
Across Vermont, as elsewhere in the country, an upsurge of interest in bicycling — not only as a form of recreation but as a way to commute — is underway. Last month the Agency of Transportation announced funding for 28 Vermont communities to enhance their streets for pedestrians and bikes.
Highlights:
- The younger population is choosing not to drive as much … we’re seeing more people living in cities younger so when they see they don’t need to own a car, which comes with a lot of costs, I think you’re seeing that transition into a desire for more biking and walking.
- There is a big increase in interest in a federal program which provides money for 80 percent of the total cost of a proposed project. The state and municipality each kick in ten percent.
- The newly designed roadways will be a boost for the downtown areas and takes note of increased numbers of bicyclists. It will make it safer for both bikers and motorists.
- Take a stretch of road designed for cars, and turn the entire stretch into a corridor for people that walk, bike and drive. It has all the criteria we were looking for.
MORE:
Saturday, October 10, 2015
North Avenue Corridor Task Force Meeting Oct 13
RICH NADWORNY, RNADWORNY@GMAIL.COM, NPA STEERING COMMITTEE MEMBER, WARD 4, BURLINGTON
Event: Oct 13, 2015, 6:00 PM to 8:00 PM
Hello,
The North Avenue task force is meeting this Tuesday, October 13 at the Miller Center between 6 PM and 8 PM. Public comments take place in the first half hour of the meeting.
Currently, items on the agenda include the phasing of the pilot, public opinion/sentiment measurement, outreach and event planning, and parking.
Anyone who is interested is welcome to attend and participate.
Thanks,
Rich Nadworny, Ward 4 NPA Task Force Representative
"Let's create An Avenue for Everyone"
Rich Nadworny, Ward 4 NPA Task Force Representative
"Let's create An Avenue for Everyone"
Thursday, October 1, 2015
Sunday, August 2, 2015
First Northeast U.S. Modern Roundabout in Montpelier Celebrates its 20th Birthday in August/U.S. Highway Safety
The
First Modern Roundabout East of Colorado and North of Maryland
Reaches 20th Birthday This August: Keck Circle
Montpelier, VT.
By Tony Redington TonyRVT99@gmail.com TonyRVT08
By Tony Redington TonyRVT99@gmail.com TonyRVT08
North
Avenue Corridor Task Force member R. J. Lalumiere video taken in
field visit by NPA 3, 4, and 7 November 1, 2013: http://goo.gl/DdajOC
(5:43 clip best summary)
At
eventide on August 16, 1995 just after application of the Spring and
Main Streets modern roundabout's first course asphalt paving, two
young bicyclists circled a time or two on the still hot circular
travelway. A few minutes later after the paving equipment fully
cleared, traffic barriers came down and the first modern roundabout
in the northeast opened for four-wheeled vehicles too. So began the
first hour of Keck Circle in Montpelier, Vermont's first
roundabout--the first north of Maryland and east of Colorado, and
19th built in the U.S.
Wednesday, July 22, 2015
Monday, June 29, 2015
Subscribe to:
Posts (Atom)











